Captain's Blog

Monthly Archives: February 2011

Winter 2011 Project

Siskiwit¬†has six opening ports and four large rings. The original ports were pulled in 1989 and replaced with ABI stainless steel ports adding 3/8″ solid teak to the outside of the fiberglass cabinside and replacing the interior cabinside with 4mm … Continue reading